Grade 4 Science: the TimeBack package is built and checked. It waits on your word to leave the machine.
_8 October 2026. Synced to Drive and emailed to Aiden and Kirsten at 20:01 on James's word ("Sync and email now", 16:10); see the last section._
The takeaways
- The whole Grade 4 course is in one package, the same shape as Grade 3's, and it passes the platform's own check: 0 schema errors, 0 cross-check errors, every picture present.
- Every lesson has its row. The videos are in for every topic but three. Topics 4 and 17 have their batches written and not yet rendered; Topic 11's five videos exist under the demo code and are not yet pointed at Topic 11 (detail below). Those 15 rows carry the narration and flip to video when the file lands, same id.
- The tests are built but not in the package. The platform has not said where a fixed test form lives (ask 13), so the four strand tests and the end-of-grade test stay in the course folder and the ledger carries a marked placeholder row where each sits.
- Two decisions for you before it goes, cards below: the PP100 banks are now smaller than the 50 we promised, and most of the pictures carry a failed sharpness check.
- The folder to sync is
handoff/COURSE_LEDGER_G4/(everything in it except_topics/). The full path is at the bottom.
Two decisions before the package leaves the machine
1. Do the PP100 banks ship at 30 to 49 items a topic, or do we top them up to 50 first?
The course promised the platform a bank of at least 50 items a topic.
Today the strand tests and the end-of-grade test took 413 bank items for their fixed forms (348 and 65), and a test item is never served as practice, so those items left the PP100 draw.
Every one of the 38 banks is now below 50; the smallest (Topics 13 and 36) hold 30.
My recommendation: ship now. A PP100 of 30 to 49 still draws a fresh test every time; topping up is new authoring and can follow as its own drop, the way Grade 3's 24 test-out items did.
Ship now / Top up first
2. Do the pictures ship as rendered, with the picture pass still running behind?
Every real-world picture in Grade 4 (391 of them) went through David's pack and its independent judge.
287 carry a FAIL verdict, 251 of them on one check: the background is soft-focused, so the picture is not "crisp everywhere". The beaver dam in Topic 26 is one of these: the scene is right, the pond behind it is soft.
The exporter ships whatever picture the figure has, so all 287 are in the package as rendered.
My recommendation: ship as rendered. A soft background is how a photograph looks; the judge's sharpness rule is stricter than a child's eye. The 36 fails that name something other than sharpness (a brake photo with lettering on the arm, for one) go back to the picture pass as retakes, and a retake keeps its file name.
Ship as rendered / Hold the package
_Applied without asking: your 8 Oct ruling that Design and build is a Physics unit (Topics 11 and 12 sit inside Physics; four strands, four strand-test placeholders); the 7 Oct text-is-cheap and fixes-forward rules._
What the package holds
- One activity ledger (the platform's v3 shape): every strand intro, topic intro and poll, lesson, attached question, quiz, mixed practice, summary and its checks, in course order. Strand by strand: Physics, Matter, Earth and Space, Living things.
- One PP100 bank (the v1 shape): every topic's mastery items, with the test items withdrawn.
images/: every drawing and picture a row names, prefixed by topic code.videos/: every video the ledger names, as a relative link to the one master file on disk (handoff/G4TNN/videos/). No copy, nothing in git, Spotlight told to leave the folder alone.- Beside the CSVs, as in Grade 3's package:
atom_standards.csv(TEKS, NGSS, Florida, Arizona per atom),lesson_standards_G4.csv(one row per lesson),VIDEO_IDS.md(every Peps id, for edits), the contract files,validate_export.py, andBUILD_REPORT.mdwith the full counts.
Typed answers carry the widened accept lists Grade 3's do. Written answers carry the model answer and the points line, but no rubric lines: the rubric table was written for Grade 3's items. That is authoring work, listed under what happens next.
What is withheld, and why
- The five tests. Four strand tests (three fixed forms each) and the end-of-grade test (three forms) are built, blind-read and at 0 FAIL, and sit in
grade4/strand_tests/andgrade4/grade_test/. The platform has no confirmed slot for a fixed form, so they are an open ask, not exported rows. Their format is still pending Becky. - 30 written test questions, two per form, held until the platform's marker has been checked against a human marker on 50 children's answers.
- Topic 5, Lesson 1's video edit. The row points at the live file, which still says "it hands over some of its energy". Your 7 Oct note ("it transfers some of its energy TO the pins") is queued with the pipeline as an edit by id. When it lands the file name does not change, so the row stands.
- Topic 11's five videos. They are live under the demo code (
handoff/G4DEMO/videos/), with your 7 Oct edits owed by id. Topic 11's own videos file still says "ready for video", so its five rows are text-only today. The fix is the video session's: point Topic 11's videos file at those five files and re-run the ledger; no id changes. I did not edit that record. - Four strand intro videos. Scripts written, nothing rendered; four text-only rows carry the narration.
- Items with no platform type. 11 reorder items are out of the bank; 34 "choose two" items are in as their pair MCQ until the platform confirms a multi-select type.
Open asks for the platform
These are the asks in TIMEBACK_SCROLL_ASKS.md that Grade 4 now leans on hardest:
- Ask 13, where a fixed test form lives. It now blocks five built tests, not a proposal.
- Ask 2, multi-select. 34 Grade 4 bank items wait in pair form.
- A reorder type. 11 bank items wait.
- Asks 17 and 17b, typed answers held to an accept list, with a spelling allowance. 92 ledger rows and 158 bank items depend on it.
- The videos folder. Grade 3's package carries its videos inside the Drive folder; this package is laid out the same way.
The folder you would sync
~/Documents/G3-5 Science/handoff/COURSE_LEDGER_G4/
Sync everything in it except _topics/ (the per-topic cache). A Drive name in Grade 3's pattern would be "Grade 4 Science - TimeBack Scroll (full package, 2026-10-08)".
It is a sibling of Grade 3's folder, not a sub-folder, on purpose: the Grade 3 folder is the one re-synced to Aiden and Kirsten, and a Grade 4 folder inside it would ride along on the next Grade 3 sync without your word.
What happens next
- You rule on the two cards. Then you say the word and the folder goes to Drive; the update email to Aiden and Kirsten is a new authorisation, not the Grade 3 one.
- The video session points Topic 11 at its live files, and Topics 4 and 17 render; each landing flips five rows, same ids.
- Grade 4's written-answer rubrics are authored (70 items) and the ledger is re-run; the rows keep their ids.
- When the platform answers ask 13, the five tests go in and the five placeholder rows come out.
Depth: counts
| What | Count |
|---|---|
| Topics / lessons | 38 / 162 |
| Ledger rows | 3,417 (885 lesson, 1,335 mcq, 1,035 cloze, 162 frq) |
| Lesson rows with a video | 223 of 238 wanted (15 waiting: Topics 4, 11, 17) |
| Lesson rows text-only | 662 (later readings of split articles, the 15 above, 4 strand intros, 5 test placeholders) |
| PP100 bank items | 1,573 across 38 topics; 30 to 49 a topic |
| Bank items withdrawn to tests | 413 (348 strand tests, 65 end-of-grade) |
| Bank items with no platform type | 11 reorder (out); 34 multi-select (in as pair MCQ) |
| Typed-answer rows | 92 in the ledger, 158 in the bank |
| Written-answer rows | 70, model answer and points line, no rubric |
| Images | 1,263 PNG, every one referenced |
| Pictures judged / FAIL / FAIL on sharpness only | 391 / 287 / 251 |
| Register atoms in the ledger | listed in atom_standards.csv; 4 lessons carry an atom with no standards code yet |
| Held written test questions | 30 (24 on the twelve strand forms, 6 on the three grade-test forms) |
Depth: validator and checks run
- Per-topic hand-over folders: all 38 rebuilt today (
build_tools_handoff.py, 11:19 to 11:22), each with its own export andvalidate_export.pyat RESULT: PASS. - Course ledger:
build_tools_course_ledger.py --grade=4 --out=handoff/COURSE_LEDGER_G4, 11:31. Validator output:
`
ledger header matches template: True (58 columns)
pp100 header matches template: True (34 columns)
ledger schema errors: 0
pp100 schema errors: 0
cross-check errors: 0
ledger rows 3417, pp100 items 1573, images referenced 1263, images present 1263
RESULT: PASS
`
- The standalone copy (
cd handoff/COURSE_LEDGER_G4 && python3 validate_export.py) gives the same PASS. - Player mimic:
build_tools_timeback_mimic.pyre-rendered all 38 topics tosite_review/g4/topicNN/timeback/;build_tools_verify_timeback_mimic.pyexit 0 on all 38 (every lesson: video card first, the attached question, every article line once and in order, every figure, every quiz item; intro, practice, summary, PP100 note). - Video links: 223 references, 223 relative symlinks made, 0 master files missing, 223 resolve.
.metadata_never_indexpresent;videos/,images/and_topics/git-ignored inside the package. - No content file changed after the exports ran (checked by modification time against every topic's content folder).
Depth: tool-side changes made today (uncommitted, for the next commit)
build_tools_export_timeback.py: the exporter skipped bank items markedstrand_testbut not those markedgrade_test, so the 65 end-of-grade items would have been served as practice. One matching line added. Grade 3 has nograde_testmarks, so its export is unchanged. The Grade 3 session should know, since the tool is shared.build_tools_course_ledger.py: the package.gitignorenow also listsvideos/.- Not changed, for the site owner:
build_tools_build_topic_site.pyhidesstrand_testitems from the PP100 tab but notgrade_testitems, so the review site still shows those 65 as practice. - Not changed, for the video session:
handoff/G4T11/videos.json(see Topic 11 above).
Depth: the package tree
`
handoff/COURSE_LEDGER_G4/
g4-science.activity-ledger-v3.csv
g4-science.pp100-bank-v1.csv
atom_standards.csv
lesson_standards_G4.csv
VIDEO_IDS.md
BUILD_REPORT.md
validate_export.py
contract/ the two schemas and two templates
images/ 1,263 PNG (git-ignored)
videos/ 223 relative symlinks + .metadata_never_index (git-ignored)
_topics/ per-topic export cache (git-ignored; do not sync)
`
Synced and emailed (8 October 2026)
On James's word ("Sync and email now", 16:10), the package went to a new Drive folder beside Grade 3's, "Grade 4 Science - TimeBack Scroll (full package, 2026-10-08)", everything in handoff/COURSE_LEDGER_G4/ except _topics/, with the video links copied as files. The copy ran from 17:26 to 19:56 (one restart at 18:56 after the background time limit; the checksum pass carried on from file 853) and the videos/ folder was re-synced at 19:56 so Topic 5 Lesson 1 carries the fresh render (md5 1e1eb12d…). Verified: 1,497 files on Drive, 1,497 local (223 videos, 1,263 images, the two CSVs, the four contract files and the five files beside them); a whole-package checksum check found 0 differences, 1,497 matching; six spot md5s (three videos, three images) all match the local masters. The Grade 3 folder was not touched (280 videos, as before). The email went to Aiden and Kirsten at 20:01 via Mail.app from james.moore@alpha.school; its text is handoff/COURSE_LEDGER/DROP_NOTES/2026-10-08_grade4_package_email.md. It names the folder, what to import, what is withheld (the five tests, Topic 4 Lesson 2's fresh render tonight, the fifteen lessons and four strand intros without video, and the PP100 banks growing in a follow-up because the test items go back into them), and the four platform asks. Still owed after this drop: Topic 4's five videos landed locally after the 11:57 export and are not yet linked in the package; the next ledger re-run picks them up.
Follow-up update (8 October 2026, late)
The follow-up the 20:01 email promised. The export was re-run the same way (build_tools_course_ledger.py --grade=4 --out=handoff/COURSE_LEDGER_G4, 20:18 to 20:24), the validator passed, the package was re-synced to the same Drive folder, and the email went to Aiden and Kirsten at 20:34. Nothing under grade4/strand_tests/ or grade4/grade_test/ was touched, and the PP100 banks have not yet taken the test items back.
What changed since the 11:57 export
- Topic 3 has a new lesson, L03b "Why a magnet always pulls steel" (atom FOR4-012b, James's ruling A40): 17 ledger rows added (
g4t03-l03b-lesson-p1to-p6,g4t03-l03b-vq1,g4t03-l03b-q01to-q10), 7 bank items added (g4t03-pp-7631258f,-e8403ca6,-4a3a7ed2,-22b56fee,-804e282b,-60a14dfd,-d2eecbc0), 6 new pictures (g4t03_clip_far,g4t03_clip_headache,g4t03_clip_poles_N__clip_poles_S,g4t03_magnet_own_poles,g4t03_rule_l03b,g4t03_seq_clip_N__seq_clip_S__seq_magnet_SS), its videoG4T03-L03b.mp4(Peps idvideo_1791473006717_6ef2b24073a12b93dfb7), and one new row inatom_standards.csv(FOR4-012b: TEKS-G4-7A, Arizona 4.P2U1.3). No id in Topic 3 changed; the 40 rows after Lesson 3 (L04, L05, practice) keep their ids and element_order, and only theiratom_ordermoves along by one. - Ten lesson rows flipped from text_only to learner_choice: Topic 4 (
g4t04-intro-lesson,g4t04-l01-lesson-p1,g4t04-l02-lesson-p1,g4t04-l03-lesson-p1,g4t04-summary-lesson→G4T04-INTRO/L01/L02/L03/SUMMARY.mp4) and Topic 17 (the same five forg4t17→G4T17-*.mp4).G4T04-L02.mp4is the fresh render (md5388a16fa90a29304f48f1f5ce8d2d692, Peps idvideo_1791473046932_bd2f6702a0b3dd5d9eb6, supersedingvideo_1791453556955_2064c7cface7bd2c7a81); the earlier render was never on Drive, since Topic 4 was text-only this morning. - Topic 11's five video files went up for the first time. The 11:57 ledger already carried them as learner_choice with
G4T11-*.mp4refs (the Topic 11 note above was written before the 11:54 relink and is out of date on that point), but the videos folder staged at 11:39 held 223 links, so Drive lacked those five files. They are relative links to the G4DEMO renders and are on Drive now. - Four pictures replaced under the same filename (the one-character picture pass committed at 12:04, after the morning export):
g4t12_test_cartoon__test_table_headache.png,g4t14_lemonade_cartoon.png,g4t14_peanut_pick_cartoon.png,g4t14_two_glasses_cartoon__two_glasses.png. - Three rows with small text changes:
g4t18-l04-lesson-p2andg4t23-l01-lesson-p1(drawing captions renamed to the one child),g4t04-l02-lesson-p1(narrationscript, a few characters). - No rows removed, no bank item changed, no id moved; the order of every pre-existing row and item is unchanged.
lesson_standards_G4.csvunchanged.VIDEO_IDS.mdandBUILD_REPORT.mdrefreshed.
Counts verified
- Validator: ledger 3,434 rows (was 3,417), bank 1,580 items (was 1,573), images referenced 1,269 = present 1,269 (was 1,263); schema errors 0, cross-check errors 0, RESULT: PASS (both the tool's run and the standalone copy).
- Video links: 239 refs in the ledger, 239 relative symlinks, 0 masters missing, 239 resolve (16 made tonight: Topics 3 L03b, 4, 11, 17).
- Drive:
rclone sync20:27 to 20:31 (same flags as the morning: copy-links, checksum, two transfers,_topics/,.gitignoreand.metadata_never_indexexcluded); two picture uploads hit a transient network error and were re-sent by rclone's own retry inside the same run; exit 0.rclone checkby checksum: 0 differences, 1,519 matching (was 1,497: +16 videos, +6 images). Drive holds 239 videos and 1,269 images; local count excluding_topics/is 1,519. Spot md5s on Drive match the masters:G4T04-L02.mp4388a16fa…,G4T04-INTRO.mp4e38ca609…,G4T17-INTRO.mp453d17a2e…,G4T03-L03b.mp493d26f6a…,G4T11-L01.mp4230916ec…; the two retried pictures also match. Both CSVs on Drive carry the new md5s (ledger bfba753a…, bank 700a51f4…). The Grade 3 folder was not touched (280 videos, as before). - Email:
handoff/COURSE_LEDGER/DROP_NOTES/2026-10-08_grade4_update2_email.md, sent 20:34 via Mail.app from james.moore@alpha.school.
Still owed after this drop: Topic 11's rows already point at the demo renders, so the fifteen "no video yet" lessons named in the 20:01 email are down to none, and only the four strand intros remain text-only; the five tests wait for a slot; the PP100 bank top-up (test items returning to the banks) comes in a later update with its own email.
Update 3 (10 October 2026)
The third re-sync under the standing authorisation. The export was re-run the same way (build_tools_course_ledger.py --grade=4 --out=handoff/COURSE_LEDGER_G4, finished 05:51), the validator passed, the package was re-synced to the same Drive folder (05:55), and the email went to Aiden and Kirsten at 05:59. Nothing under grade4/strand_tests/ or grade4/grade_test/ was touched, and the PP100 banks have not yet taken the test items back. Grade 5 has its own folder and is not part of this package.
What changed since the 20:34 update on 8 October
- Topic 1 "Why sliding things stop" took Olivia's review (68 text notes applied and blind-read, 10 Oct 02:50). Ledger: one row removed (
g4t01-l01-q11), 48 rows with new text (one article pageg4t01-l01-lesson-p2; quiz rows in L01 to L05; practice rowsg4t01-pr-*;g4t01-summary-q1and-q3), the other 50 Topic 1 rows byte-identical; no Topic 1 ledger id changed and the row order is unchanged (99 → 98 rows). Bank: Topic 1 48 → 44 exported items (the source bank went 56 → 52; the eight-item gap is the held-back multi-select items, as before). A bankitem_idis a content hash, so a reworded item gets a new id: 37 ids removed, 33 added, 11 kept (g4t01-pp-eef77555,-9373bdfa,-83d9ef7d,-27c30e38,-9996ab98,-2cf68833,-9703adca,-6a03e0ef,-af1ca8a9,-72d9f31c,-fa605a76; of the kept,-9373bdfaand-9703adcachangedatom_id/associated_lesson_id/primary_kc_id,-2cf68833changeddok_level/difficulty, the other eight are byte-identical). The full removed and new lists are in the email file. - The 9 Oct exporter fix reached Grade 4 (commit 6f2c2f0e, made for Grade 3: a multi-select exported as a bundled MCQ carries a matching prompt,
bundled_stem). This was the first Grade 4 export since, so every "select TWO" bank item now ends "Choose the one answer that lists all of them." and takes a new hash id: 31 bank items in 24 topics renamed (Topics 2, 3, 5, 7, 8, 9, 10, 13, 14, 16, 17, 18, 19, 20, 23, 24, 25, 26, 27, 28, 29, 32, 35, 36; only the prompt's last sentence differs between each old and new row; pairs listed in the email). Three ledger rows gained the same sentence under their existing ids:g4t35-l06-q05,g4t35-l06-q07,g4t35-pr-q09. The bank's item count is otherwise unchanged by this (1,580 − 37 + 33 = 1,576). - Four videos replaced under the same filename and the same Peps id (edits by id, so
VIDEO_IDS.mdis unchanged):G4T01-L01.mp4(visual: one push, the box slows and stops; md5 baa7f6f9…),G4T01-L02.mp4(one narration line; 30cd924b…),G4T01-L04.mp4(one narration line; e9ad13ae…),G4T36-L02.mp4(printed rule box removed; 39c91fce…). The ledger'svideo_source_reffor those four rows is unchanged. - Unchanged:
images/(1,269 files, no file replaced),atom_standards.csv,lesson_standards_G4.csv,VIDEO_IDS.md, the four contract files andvalidate_export.py.BUILD_REPORT.mdrefreshed (date, Topic 1 bank count 48 → 44, totals).
Counts verified
- Validator: ledger 3,433 rows (was 3,434), bank 1,576 items (was 1,580), images referenced 1,269 = present 1,269; schema errors 0, cross-check errors 0, RESULT: PASS (the tool's run and the standalone copy).
- Diff against the committed CSVs (keyed on
element_id/item_id): ledger 1 removed, 0 added, 51 changed (48 Topic 1, 3 Topic 35), surviving-id order unchanged; bank 68 removed, 64 added, 3 changed (all Topic 1 tag changes), of which 31 removed/added pairs are the bundled-stem rename and 37/33 are Topic 1. - Drive:
rclone sync handoff/COURSE_LEDGER_G4 "gdrive:Grade 4 Science - TimeBack Scroll (full package, 2026-10-08)" --copy-links --checksum --transfers 2 --exclude "_topics/" --exclude ".gitignore" --exclude ".metadata_never_index"(dry run first: exactly 7 files to copy, 0 to delete); the live run 05:55:03 to 05:55:54, 7 files replaced (two CSVs,BUILD_REPORT.md, four videos), 1,519 checks, exit 0.rclone checkby checksum: 0 differences, 1,519 matching**. Drive holds 239 videos and 1,269 images. Spot md5s on Drive match local for all four videos and both CSVs (ledger 67f84326…, bank e99ca36c…). The Grade 3 folder was not touched (280 videos, as before). - Email:
handoff/COURSE_LEDGER/DROP_NOTES/2026-10-10_grade4_update3_email.md, sent 05:59 via Mail.app from james.moore@alpha.school.
Still owed after this drop: the five tests wait for a slot; the PP100 bank top-up (test items returning to the banks) comes in a later update with its own email; the four strand intros remain text-only.
Update 4 (15 October 2026)
The fourth re-sync under the standing authorisation, and the first under James's 15 Oct ruling that package emails go to David only (reviews/james/RULINGS_2026-10-15.md § package-emails-david-only). The export was re-run the same way (build_tools_course_ledger.py --grade=4 --out=handoff/COURSE_LEDGER_G4, 17:48 to 17:52), the validator passed, the package was re-synced to the same Drive folder (18:01 to 18:05), and the email went to David at 18:21. Nothing under grade4/strand_tests/ or grade4/grade_test/ was touched.
What changed since the 05:59 update on 10 October
- The mixed practice is folded into the PP100 banks (James with David, 15 Oct). Every topic's PRACTICE is empty, so the ledger drops every practice row: 532 rows, all of the form
g4tNN-pr-qNN(294 mcq, 151 cloze, 87 frq; 11 to 18 a topic), and no other row vanished. The topic flow is now the last lesson's quiz → the summary video and its questions → the PP100. The 138 rows after each topic's last lesson (summary rows) change only theiratom_order; the order of every surviving id is unchanged. - Bank 1,576 → 1,798 items. 231 new ids (every topic grew: +1 in Topics 25, 31, 34 up to +10 in Topics 1, 2, 12, 35), 9 ids renamed by rewording (Topic 1 ×1, 5 ×2, 13 ×1, 16 ×2, 24 ×2, 27 ×1; old-to-new pairs in the email), 10 in place with only their per-option feedback changed (Topic 5 ×9, "crash" → "collision"; Topic 16 ×1). Exported banks now run 36 (Topic 13) to 57 (Topics 2, 3) a topic; 16 topics are at 50 or more in the export. The exporter still leaves out the reorder items (15 now, was 11) and exports the multi-select items as pair MCQs (32, was 31), so the source banks are a little larger than the export. No two-option item reached the export (the validator's new two-option warning did not fire).
- 119 ledger rows in 25 topics have new text under their ids: the coined-term reuse pass (14 Oct), "stuff" → "matter" in Topics 13, 14, 16, 24, 27, and "force of gravity" in Topics 1, 5, 20 (15 Oct). Most in Topics 5 (16), 2 (13), 16 (12), 14 (11). Fields touched:
lesson_body_markdown57, feedback lines 82,prompt19,cloze_text16,script14. - Topic 26 Lesson 4's quiz gained one question,
g4t26-l04-q08(the only added ledger row); q05 to q07 of that quiz swapped type and depth between themselves and the titles read "of 8". - Five videos replaced under the same filename and the same Peps id (edits by id;
VIDEO_IDS.mdunchanged):G4T03-L04.mp4(6fbdcb4b…),G4T14-L01.mp4(c56976d7…),G4T18-SUMMARY.mp4(eba4f256…),G4T34-L02.mp4(cc2abf10…),G4T34-L03.mp4(d7dff010…). Their.prevmasters are dated 14 Oct 09:51 to 16:24. - Pictures: 1,269 → 1,250. The ledger lost 46 practice-only picture references and the bank gained 27 of them back with the folded items, so 19 files left the package (
g4t06_pr_pair_pool_pond,g4t06_pr_therm_52,g4t13_pr_oak_before,g4t13_pr_two_lunchbox,g4t21_pr_cliff_1,g4t22_pr_map_fg,g4t22_pr_table_xy,g4t25_pr_billings_nov,g4t25_pr_charleston_sept,g4t25_pr_graph_boise,g4t25_pr_table_boise,g4t25_pr_therm_46,g4t26_pr_map_1,g4t27_q_card_ranch,g4t30_pr_arcs_mn,g4t30_pr_graph_three_falling,g4t32_pr_disc_crescent_l,g4t32_pr_order_jklm,g4t32_q_disc_more_l) and 9 were replaced under the same filename (g4t14_card_raisins_only__card_raisins_peanuts,g4t14_card_three__card_sand_water__card_water_only,g4t14_rule_mixture__trail_mix_photo__sand_water_photofrom the 14 Oct "matter" redraw;g4t07_pr_paths_vase,g4t08_pr_amp,g4t08_pr_arrows,g4t08_pr_draw,g4t08_pr_msg,g4t08_pr_wlre-rendered with the fold). - Unchanged:
atom_standards.csv,lesson_standards_G4.csv,VIDEO_IDS.md, the four contract files.validate_export.pyin the package carries the 15 Oct two-option allowance (a warning, not an error; it did not fire for Grade 4).BUILD_REPORT.mdrefreshed.
Counts verified
- Validator: ledger 2,902 rows (was 3,433), bank 1,798 items (was 1,576), images referenced 1,250 = present 1,250; schema errors 0, cross-check errors 0, RESULT: PASS (the tool's run and the standalone copy).
- Diff against the committed CSVs (keyed on
element_id/item_id): ledger 532 removed (all-pr-), 1 added, 257 changed (138atom_orderonly, 119 text), surviving-id order unchanged, novideo_source_refchanged; bank 9 removed, 231 added, 10 changed in place. - Drive: dry run first (exactly 18 files to copy, 19 to delete); the live
rclone sync handoff/COURSE_LEDGER_G4 "gdrive:Grade 4 Science - TimeBack Scroll (full package, 2026-10-08)" --copy-links --checksum --transfers 2 --exclude "_topics/" --exclude ".gitignore" --exclude ".metadata_never_index"ran 18:01:05 to 18:05:50; one picture upload hit a Drive per-minute quota error and rclone's own second attempt completed it and the 19 deletes.rclone checkby checksum: 0 differences, 1,500 matching** (was 1,519: −19 pictures). Drive holds 239 videos and 1,250 images. Spot md5s on Drive match local:G4T34-L02.mp4cc2abf10…,G4T18-SUMMARY.mp4eba4f256…, ledger f3e6dd67…, bank 3d9ee174…. The Grade 3 folder was not touched (280 videos, as before); Grade 5 has its own folder. - Email:
handoff/COURSE_LEDGER/DROP_NOTES/2026-10-15_grade4_update4_email.md, sent 18:21 via Mail.app from james.moore@alpha.school to david.babagbale@alpha.school only.
Still owed after this drop: the five tests wait for a slot; the four strand intros remain text-only; James's open card on the folded items' option counts (q-G35FOLD-1) may change some bank rows in a later update.
Update 5 (16 October 2026)
The fifth re-sync under the standing authorisation, emailed to David only (15 Oct ruling). The export was re-run the same way (build_tools_course_ledger.py --grade=4 --out=handoff/COURSE_LEDGER_G4, 14:54 to 14:57), the validator passed, the package was re-synced to the same Drive folder (15:01:46 to 15:01:54), and the email went to David at 15:07. Nothing under grade4/strand_tests/ or grade4/grade_test/ was touched.
What changed since the 18:21 update on 15 October
- An item-wording pass across all 38 topics on Olivia's recurring themes (James, 16 Oct; commit 3692286f5): long stacked stems shortened to a direct question; "X says … is X right?" wrappers around plain facts made direct asks; negative "which sentence shows she is wrong" items made positive; two-defensible distractors fixed; "nothing pushes it" options replaced. Keys unchanged, item counts unchanged.
- 104 ledger rows in 31 topics have new text under their existing ids (69 cloze, 33 mcq, 2 frq; most in Topics 1 (16) and 12 (11), then 2, 15 and 20 (6 each)). Fields touched:
cloze_text69,activity_feedback37,prompt32,cloze_word_bank27, per-option feedback 14, option text (mcq_a/b/c) 9.accepted_answerschanged in 0 rows. No ledger row added or removed; the order of every id is unchanged; novideo_source_refchanged. - 207 bank items in 36 topics renamed by rewording (ids are content hashes): most in Topics 11 (17), 12 (15), 1 and 20 (13 each), 22 (12); none in Topics 6 and 9. Each renamed item sits at the same position with the same lesson, atom, family, type and key as the id it replaces. 0 changed in place, 0 added, 0 removed; bank still 1,798. Old-to-new pairs, grouped by topic, at the end of the email.
- No video or picture changed: no
.prevmaster underhandoff/G4T*/videos/and no file inimages/is newer than 15 Oct 18:21. Drive still holds 239 videos and 1,250 images. - Unchanged:
atom_standards.csv,lesson_standards_G4.csv,VIDEO_IDS.md, the four contract files,validate_export.py.BUILD_REPORT.mdrefreshed. - The source pass reworded 449 items; the package shows 311 (104 + 207). The remainder is items the exporter does not carry in that form (reorder items, multi-select items exported as pair MCQs) or changes in fields the export does not include. Not investigated further in this update.
Counts verified
- Validator: ledger 2,902 rows, bank 1,798 items, images referenced 1,250 = present 1,250; schema errors 0, cross-check errors 0, RESULT: PASS (the tool's run and the standalone copy).
- Diff against the committed CSVs (keyed on
element_id/item_id): ledger 0 removed, 0 added, 104 changed (all text), order unchanged; bank 207 removed, 207 added (positional pairs), 0 changed in place. - Drive: dry run first (exactly 3 files to copy: the two CSVs and
BUILD_REPORT.md; 0 to delete); the liverclone sync handoff/COURSE_LEDGER_G4 "gdrive:Grade 4 Science - TimeBack Scroll (full package, 2026-10-08)" --copy-links --checksum --transfers 2 --exclude "_topics/" --exclude ".gitignore" --exclude ".metadata_never_index"ran 15:01:46 to 15:01:54 with no errors.rclone checkby checksum with--copy-links: 0 differences, 1,500 matching** (without--copy-linksthe 239 video symlinks show as differences; that is the flag, not the files). Spot md5s on Drive match local: ledger d460438e…, bank 182f72f0…,G4T34-L02.mp4cc2abf10…. The Grade 3 folder was not touched. - Email:
handoff/COURSE_LEDGER/DROP_NOTES/2026-10-16_grade4_update5_email.md, sent 15:07 via Mail.app from james.moore@alpha.school to david.babagbale@alpha.school only.
Still owed after this drop: the five tests wait for a slot; the four strand intros remain text-only; James's open card on the folded items' option counts (q-G35FOLD-1) may change some bank rows in a later update.
Update 6 (18 October 2026)
The sixth re-sync under the standing authorisation, emailed to David only (15 Oct ruling). The export was re-run the same way (build_tools_course_ledger.py --grade=4 --out=handoff/COURSE_LEDGER_G4, 18 Oct 22:52 to 22:55), the validator passed, the package was re-synced to the same Drive folder (18 Oct 23:16:29 to 19 Oct 00:41:51, 85 minutes for 848 files), and the email went to David at 00:51 on 19 Oct. Nothing under grade4/strand_tests/ or grade4/grade_test/ was touched.
What changed since the 15:07 update on 16 October
- 46 live videos replaced under the same filenames and Peps ids (James's 16 and 17 Oct rulings on realism: people drawn whole, a person's hand does the action, nothing appears from nowhere; a force arrow's tail starts on the object). Each edit by id, recorded in the topic's
handoff/G4TNN/videos/FEEDBACK_2026-10-17_realism.mdor_arrows.md; the old master is kept beside it as.prev.mp4. Found by comparinghandoff/G4T/videos/.mp4against Drive by checksum (an mtime scan finds 45:G4T11-L01.mp4is a symlink toG4DEMO-L01.mp4, whose own file changed on 18 Oct). - A person now does the action, or is drawn whole (39): T03 L05; T04 INTRO; T05 L04; T06 L03, L04; T08 L05; T10 L02, L03; T11 L01; T12 INTRO, L01, L03, L04; T13 INTRO, L01, L02; T14 L01; T15 L01, L02; T16 INTRO, L02, L03; T17 L01, L03; T18 L04; T19 L01; T20 INTRO; T22 L02, L03; T24 L05; T28 INTRO, L01, L03; T29 L03; T31 L01; T32 L03, L05; T33 INTRO; T37 L03.
- Force arrow starts on the object (2): T01 L02; T12 L01 (as well as its hand edit).
- One narration line reworded, picture unchanged (6, the 14 and 15 Oct coined-term and matter-not-stuff landings): T08, T14, T17, T31 and T37 SUMMARY; T16 L01.
- 800 of the 1,250 package images are new files under the same filenames. Source: 1,038 rendered figures landed in
handoff/G4T*/images/generated/on 16 Oct (19h, 644 files) and 17 Oct (14h, 394 files) from David's figures pipeline (James, 16 Oct: "page and article figures have been redone via davids pipeline"), plus the Topic 1 L02 and Topic 12 L01/L04 arrow redraws. The Drive copies were 8 Oct code-drawn PNGs (tens of KB); the new ones are 0.5 to 1.5 MB renders. Everyimage_urlis unchanged. Two spot-reads (g4t01_bed_friction.png,g4t05_clack.png) looked right. Not anticipated in the update brief, which expected videos only; reported to James. - 9 ledger rows have new text under their existing ids, all lesson rows:
image_descriptionin 8 (Topic 1 L02 p2 to p4: the friction arrow now "starts on the left leg's foot"; Topic 3 L03b p2: the chip "PUSH: THE MAGNET" dropped from the description; Topic 12 L01 p2 and p3, L04 p2 and p4: the PUSH arrow now "starts on the blade");scriptin 1 (Topic 25 L05 p1: "writes:" to "says:", twice).accepted_answers, keys, option text andvideo_source_refchanged in 0 rows. No row added or removed; order unchanged. - Bank unchanged:
g4-science.pp100-bank-v1.csvis byte for byte the committed file (md5 182f72f0…); 0 changed, 0 added, 0 removed; still 1,798. - Unchanged:
atom_standards.csv,lesson_standards_G4.csv,VIDEO_IDS.md, the four contract files,validate_export.py(the dry run listed none of them).BUILD_REPORT.mdrefreshed.
Counts verified
- Validator (run with no arguments; it does not take the folder as its argument): ledger 2,902 rows, bank 1,798 items, images referenced 1,250 = present 1,250; schema errors 0, cross-check errors 0, RESULT: PASS.
- Diff against the committed CSVs (keyed on
element_id/item_id): ledger 0 removed, 0 added, 9 changed (all text), order unchanged; bank 0 / 0 / 0. - Drive: dry run first (848 files to copy: 2 at the root (ledger CSV,
BUILD_REPORT.md), 46 videos, 800 images; 0 to delete); the liverclone sync handoff/COURSE_LEDGER_G4 "gdrive:Grade 4 Science - TimeBack Scroll (full package, 2026-10-08)" --copy-links --checksum --transfers 2 --exclude "_topics/" --exclude ".gitignore" --exclude ".metadata_never_index"ran with exit 0 and no errors.rclone checkby checksum with--copy-links: 0 differences, 1,500 matching**. Spot md5s on Drive match local:G4T01-L02.mp41a0c43fa…,G4T13-L02.mp4d61aaf2b…,G4T37-L03.mp49321112e…, ledger a6f79c94…, bank 182f72f0…. Drive still holds 239 videos and 1,250 images. The Grade 3 folder was not touched. - Email:
handoff/COURSE_LEDGER/DROP_NOTES/2026-10-18_grade4_update6_email.md, sent 19 Oct 00:51 via Mail.app from james.moore@alpha.school to david.babagbale@alpha.school only.
Still owed after this drop: the last three wording edits on live videos land in a further small update; the five tests wait for a slot; the four strand intros remain text-only; James's open card on the folded items' option counts (q-G35FOLD-1) may change some bank rows later.
Update 7 (19 October 2026)
The seventh re-sync under the standing authorisation, emailed to David only. This is the small follow-up promised in Update 6's email ("a further small update follows when the last three wording edits land"). The export was re-run the same way (build_tools_course_ledger.py --grade=4 --out=handoff/COURSE_LEDGER_G4, 19 Oct 05:47 to 06:01; slower than before because the image renders are now large files), the validator passed, the package was re-synced to the same Drive folder (06:01:52 to 06:02:38, four files), and the email went to David at 06:07. Nothing under grade4/strand_tests/ or grade4/grade_test/ was touched.
What changed since the 00:51 update on 19 October
- Three live videos replaced under the same filenames and Peps ids (the last three term-pass and realism landings, commits 7cff9dd99 and 07fe943cb):
G4T16-SUMMARY.mp4: one narration line reworded to "the same matter: water" (picture unchanged). md5 d6fe22ed….G4T20-SUMMARY.mp4: one narration line reworded to "ice in glaciers" (picture unchanged). md5 a0de40a6….G4T13-L03.mp4: one narration line reworded to "are sinkers", and the realism fix (Miss Castillo's arm drawn properly; Emilia holds the magnet). md5 b6e54aaa….- Nothing else changed.
g4-science.activity-ledger-v3.csv(md5 a6f79c94…) andg4-science.pp100-bank-v1.csv(md5 182f72f0…) are byte for byte the committed files: 0 rows added, removed or changed in each; still 2,902 and 1,798.atom_standards.csv,lesson_standards_G4.csv,VIDEO_IDS.md, the four contract files andvalidate_export.pyare unchanged. All 1,250 images unchanged.BUILD_REPORT.mddiffers only in its date line.
Counts verified
- Validator (no arguments): ledger 2,902 rows, bank 1,798 items, images referenced 1,250 = present 1,250; schema errors 0, cross-check errors 0, RESULT: PASS.
- Drive: dry run first (4 files to copy:
BUILD_REPORT.mdand the three videos; 0 to delete; 1,500 checks); the liverclone sync handoff/COURSE_LEDGER_G4 "gdrive:Grade 4 Science - TimeBack Scroll (full package, 2026-10-08)" --copy-links --checksum --transfers 2 --exclude "_topics/" --exclude ".gitignore" --exclude ".metadata_never_index"ran with exit 0 and no errors.rclone checkby checksum with--copy-links: 0 differences, 1,500 matching**. Drive md5s of the three replaced videos equal the local masters (above). Drive still holds 239 videos and 1,250 images. The Grade 3 folder was not touched. - Email:
handoff/COURSE_LEDGER/DROP_NOTES/2026-10-19_grade4_update7_email.md, sent 19 Oct 06:07 via Mail.app from james.moore@alpha.school to david.babagbale@alpha.school only.
This completes the realism and wording fixes on Grade 4's live videos; the video edit queue is empty. Still owed: the five tests wait for a slot; the four strand intros remain text-only; James's open card on the folded items' option counts (q-G35FOLD-1) may change some bank rows later.